Events

 
22.02.2012

Testing of distributed control systems and emergency protection equipment

Specialists of the company «IPS Invensys Process Systems» started installation and testing of equipment of distributed control systems and emergency protection at the Yaya oil refinery. Individual testing of the equipment is planned before the end of April. By the start of commissioning the entire system of the plant must operate in the standard operating mode.


Возврат к списку